Silvertech has successfully executed a contract to modify the following existing systems for Qatar Petroleum’s Stations B and U1:
- SCADA System (Stations B and U1)
- ESD and F&G Systems (Station U1)
- F&G Systems (Station B)
Aside from the modifications, Silvertech was also tasked to design, engineer, manufacture, test and deliver the following panels:
- MOV Control Panel (Pakscan) for Station U1
- Pressure Control Panel in Station U1
- F&G Marshalling Panel in Station U1, containing additional HIMA IO racks for the additional signals
In the ESD System at Station U1 and F&G System at Station B, new I/O racks were added to the existing panels to include the modules for the new signals under the GSUD project.
Silvertech’s scope of work also included the handling of internal wiring for all the additional racks and modules in the ESD and F&G systems at Station U1 and the F&G system at Station B as well as the supply of numerous field devices.
Similar projects

Offshore RTUs at Idd El Shargi South Dome
Occidental Petroleum of Qatar (Oxy) is developing…
Technology : RTU
Sector : Oil & Gas

Pressure Reduction and Metering System Upgrade
As part of the Pressure Reducing and Metering Station…
Technology : PLC, DCS
Sector : Oil & Gas

ICSS Replacement at UAD Facilities - Offshore
Silvertech has successfully executed an EPC contract…
Technology : ICSS
Sector : Oil & Gas