Fire & Gas System Replacement at NGL Area
Silvertech has successfully executed an EPC contract to revamp the complete Fire & Gas system at the NGL process and storage & loading area at Mesaieed in Qatar. A twenty year old Seiger system and corresponding detectors spread throughout the plant were changed to new detectors/actuators.
This was a turnkey job involving kilometres of cabling, hundreds of detector installation and an online changeover as NGL is the main stay of Qatar and any unplanned shutdown would be very costly for the customer.
Silvertech’s EPC scope also included:
- Endorsement of FEED
- Initial Design Engineering
- EPC Project Management, Planning, QA/QC, HSE
- Supply, design, testing, installation and commissioning of Hima F&G Systems
- Supply, testing, installation and commissioning of F&G detectors
- Field Installation Engineering
- Associated cable tray and cable trench works
- Scaffolding works
- Documentation
Similar projects

Bab Field Production Facilities Expansion Project
Silvertech has successfully executed a contract to…
Technology : ESD
Sector : Oil & Gas

Das Island Boilers Control System Upgrade
ADMA-OPCO operates 5 boilers (Boiler # 3, 4, 5, 6…
Technology : PLC
Sector : Oil & Gas