ESD System at Nine Gas Gathering Stations
Silvertech has successfully executed an EPIC contract to upgrade the ESD system at the following field facilities:
- Omar CPF
- Tanak CPF
- Isba CPF
- Gathering Station A (GSA)
- Gathering Station B (GSB)
- Gathering Station C (GSC)
- Saban
- Sijan
- Galban
The supplied ESD System was based on Hima’s 51qHS Programmable Logic Controller (PLC) system. Silvertech designed, engineered, manufactured, tested and delivered nine ESD systems. Silvertech was also responsible for carrying out the installation of the system & marshalling panels, field devices/instruments at site, SAT and system commissioning.
Silvertech’s EPC scope also included:
- Endorsement of FEED
- Initial Design Engineering
- EPC Project Management, Planning, QA/QC, HSE
- Supply, design, testing, installation and commissioning of Hima Safety Systems
- Supply, testing, installation and commissioning of field devices
- Field Installation Engineering
- Associated cable tray and cable trench works
- Scaffolding works
- Documentation
Similar projects

Fire & Gas Detection System at Mina Al-Ahmadi Refinery
Silvertech has successfully executed a contract for…
Technology : F&G
Sector : Oil & Gas

Upgradation of Control Systems at NFGP Plant
Silvertech has successfully executed an EPIC contract…
Technology : PLC
Sector : Oil & Gas

Pressure Reduction and Metering System Upgrade
As part of the Pressure Reducing and Metering Station…
Technology : PLC, DCS
Sector : Oil & Gas