  • Upgradation of Control Systems at NFGP Plant
  • Upgradation of Control Systems at NFGP Plant

Upgradation of Control Systems at NFGP Plant

Silvertech has successfully executed an EPIC contract to upgrade the control systems of Sour Gas Compressor 6112-KT-01, Turbo Expanders 6103-K01-A/B, SRU Blowers/Compressors 9101-K-01 A/B and Flame Detectors 6112-F01/2, 6102 F01, 6848A-01 A/B and 9101 F-01/02/03 in Qatar Petroleum’s North Field Gas Plant (NFGP).

Silvertech supplied an Allen Bradley ControlLogix SIL2 PLC based system, which also includes:

  • Bently Nevada 3500 Machinery Protection and Monitoring Systems
  • CCC 3++ Anti-Surge Control Systems

The existing flame detectors were replaced with radio active interference free Fireye Enhanced UV Insight scanner.

Silvertech’s EPC scope also included:

  • Endorsement of FEED
  • Initial Design Engineering
  • EPC Project Management,Planning, QA/QC, HSE
  • Supply, design, testing, installation and commissioning of ControlLogix PLC System
  • Supply, design, testing, installation and commissioning of Bently Nevada 3500 Machinery Protection and Monitoring Systems
  • Supply, design, testing, installation and commissioning of CCC 3++ Anti-Surge Control Systems
  • Field Installation Engineering
  • Associated cable tray and cable trench works
  • Documentation



Similar projects

Fire & Gas Detection System Replacement at Bu-Hasa Power Station

Fire & Gas Detection System Replacement at Bu-Hasa…

Silvertech has successfully executed an EPC contract…

Technology : F&G
Sector : Oil & Gas

Cluster-7 Well Platforms Project

Cluster-7 Well Platforms Project

Silvertech has successfully executed a contract for…

Technology : F&G
Sector : Oil & Gas

Das Island Boilers Control System Upgrade

Das Island Boilers Control System Upgrade

ADMA-OPCO operates 5 boilers (Boiler # 3, 4, 5, 6…

Technology : PLC
Sector : Oil & Gas

Share
Newsletter