Silvertech has successfully an EPC contract for the replacement of existing RTU system for ZADCO’s Satah Facilities. A total of six (6) wellhead platforms (WHP 1, 2, 3, 6, 8 & 9) need to be monitored remotely. Data from these six (6) WHPs will be transmitted to a production platform and from here will be relayed wirelessly to WIP control room MTU.
Silvertech’s scope under the EPC contract also included:
- Endorsement of FEED
- Initial Design Engineering
- EPC Project Management, Planning, QA/QC, HSE
- Supply, design, testing, installation and commissioning of Siemens RTU System
- Supply, testing, installation and commissioning of 2.4 GHz WiLAN radios
- Field Installation Engineering
- Associated cable laying and cable tray works
- Scaffolding works
- Documentation
Similar projects

Fire & Gas System Replacement at NGL Area
Silvertech has successfully executed an EPC contract…
Technology : F&G
Sector : Oil & Gas

Cluster-7 Well Platforms Project
Silvertech has successfully executed a contract for…
Technology : F&G
Sector : Oil & Gas

Pressure Reduction and Metering System Upgrade
As part of the Pressure Reducing and Metering Station…
Technology : PLC, DCS
Sector : Oil & Gas